Studi Perhitungan Biaya Pada Kegiatan Pengupasan Overburden Pada PIT 5 PT. Indochin Resources Jobsite PT. Energi Cahaya Industritama

Cost Calculation Study On Overburden Removal Activities At Pit 5 Pt. Indochin Resources Jobsite Pt. Industritama Light Energy

Authors

  • Hikmawati Program Studi S1 Teknik Pertambangan, Fakultas Teknik, Universitas Mulawarman
  • Henny Magdalena Program Studi S1 Teknik Pertambangan, Fakultas Teknik, Universitas Mulawarman
  • Windhu Nugroho Program Studi S1 Teknik Pertambangan, Fakultas Teknik, Universitas Mulawarman
  • Harjuni Hasan Program Studi S1 Teknik Pertambangan, Fakultas Teknik, Universitas Mulawarman
  • Lucia Litha Respati Program Studi S1 Teknik Pertambangan, Fakultas Teknik, Universitas Mulawarman

DOI:

https://doi.org/10.36312/jomet.v2i3.38

Abstract

During the stripping and hauling of overburden, there are several things that affect this activity, namely the productivity of the equipment, working front conditions, loading methods, and working hours. Before carrying out mining activities, it is necessary to calculate a budget, the aim is to provide an overview of the costs to be incurred by the company for mining activities. The results of research that has been carried out for one month shows that the productivity of the tools used for stripping overburden is obtained as follows. The productivity of the Sany SY365H PRO excavator in fleet 1 was 221.13 bcm/hour and the productivity of the Sany SY365H PRO excavator in fleet 2 was 226.11 bcm/hour. And the productivity of the DT SYZ322C-8S conveyance in Fleet 1 is 37.37 bcm/hour and the productivity of the DT SYZ322C-8S conveyance in Fleet 2 is 37.38 bcm/hour. The costs that must be incurred for the tools used in overburden stripping activities are obtained as follows. The ownership cost of the Sany SY365H PRO Excavator digging-loading equipment is US$ 9.93/hour, operating costs are US$ 32.55/hour. The cost of owning the DT SYZ322C-8S means of transportation is US$ 0.54/hour, and operating costs are US$ 12.14/hour.

Downloads

Published

2023-09-30

How to Cite

Hikmawati, Magdalena, H., Nugroho, W., Hasan, H., & Respati, L. L. (2023). Studi Perhitungan Biaya Pada Kegiatan Pengupasan Overburden Pada PIT 5 PT. Indochin Resources Jobsite PT. Energi Cahaya Industritama: Cost Calculation Study On Overburden Removal Activities At Pit 5 Pt. Indochin Resources Jobsite Pt. Industritama Light Energy. Journal of Media, Sciences, and Education, 2(3), 93–100. https://doi.org/10.36312/jomet.v2i3.38